Christmas Refurbishment @ NASAM – As At 2 Jan 19
Christmas Refurbishment @ NASAM – As At 2 Jan 19 The hand dryers are in place in the toilets, so no more paper towels. Three of the propellers have now been re-attached to the wall which has also enabled us to fit the remaining cabinet tops on the left-hand wall. The electricians have been hard […]
Christmas Refurbishment @ NASAM – As At 2 Jan 19 Read More »