From the Chairman

Christmas Refurbishment @ NASAM – As At 8 Jan 19

Christmas Refurbishment @ NASAM – As At 8 Jan 19 Some of the shelves are now restocked so it’s beginning to look more like a shop. Another propeller was hung today leaving only one to go. Continued good work by the various volunteers that have attended over Christmas ensured that a great deal of work […]

Christmas Refurbishment @ NASAM – As At 8 Jan 19 Read More »

Christmas Refurbishment @ NASAM – As At 2 Jan 19

Christmas Refurbishment @ NASAM – As At 2 Jan 19 The hand dryers are in place in the toilets, so no more paper towels. Three of the propellers have now been re-attached to the wall which has also enabled us to fit the remaining cabinet tops on the left-hand wall. The electricians have been hard

Christmas Refurbishment @ NASAM – As At 2 Jan 19 Read More »

Christmas Refurbishment @ NASAM – As At 27 Dec 18

Christmas Refurbishment @ NASAM – As At 27 Dec 18 Sorry but I have lost track of how many days we have been doing this now (on the 27th, it was the 15th day since the refurb started .. Ed ..). Today saw the last of the cabinets painted, plus the new book display unit installed

Christmas Refurbishment @ NASAM – As At 27 Dec 18 Read More »