NASAM Updates

These are information updates from the various sections at the site. These are all the departments.

Christmas Refurbishment @ NASAM – As At 2 Jan 19

Christmas Refurbishment @ NASAM – As At 2 Jan 19 The hand dryers are in place in the toilets, so no more paper towels. Three of the propellers have now been re-attached to the wall which has also enabled us to fit the remaining cabinet tops on the left-hand wall. The electricians have been hard […]

Christmas Refurbishment @ NASAM – As At 2 Jan 19 Read More »

Christmas Refurbishment @ NASAM – As At 28 Dec 18

Christmas Refurbishment @ NASAM – As At 28 Dec 18 Day 16 since the refurbishment of the shop started; ceiling and walls painted, cabinets and counter painted and installed, electrics and electronics ready for finishing.  And, thanks to the sterling work of all the volunteers involved, the project is on schedule. The 28th December saw the local

Christmas Refurbishment @ NASAM – As At 28 Dec 18 Read More »

Christmas Refurbishment @ NASAM – As At 27 Dec 18

Christmas Refurbishment @ NASAM – As At 27 Dec 18 Sorry but I have lost track of how many days we have been doing this now (on the 27th, it was the 15th day since the refurb started .. Ed ..). Today saw the last of the cabinets painted, plus the new book display unit installed

Christmas Refurbishment @ NASAM – As At 27 Dec 18 Read More »