Christmas Refurbishment @ NASAM – Sunday 16 Dec 2018

Christmas Refurbishment – Sunday 16 Dec 2018

The target for Sunday 16 Dec 2018 at the Norfolk and Suffolk Aviation Museum, was to fill in the various holes in the shop walls and ceiling, plus paint the ceiling. This has now been completed, and although we’re a long way from the finish line, progress can be seen.

For the refurbishment of the toilets, the ladies toilet has now had the first coat of emulsion; sadly we had to decide to paint over the very faded murals on the walls. Once it’s painted, we will look for a new way to provide some highlights. The new coat of paint looks very pink!